The 120m saturated diving system is mainly used for diving salvage operations, diving diseases rescue and treatment. By using modular design, it can quickly load and remove on any ship.
▲Operation console
▲Flank
▲Diving bell
▲Diving bell
GENERAL INTRODUCTION | TECHNICAL PARAMETER |
Saturation diving chamber | Decompression chamber working pressure:≥1.2Mpa(120m) |
Diving bell | Diving bell working pressure:≥1.2Mpa(120m) |
Central control room(Saturation chamber console, clock console, lifting console, etc.) | Decompression chamber capacity:4 persons |
Life supporting system | Diving bell capacity:3 persons |
Environmental control system | Chamber body+Frame:7000×3000×3200mm |
Lifting system(operation control console、Hangers, winches, guided ballasts, etc.) | Flat frame steel structure:6800×3000×3000mm |
Underwater acoustic communication | Door frame:9000x4600x6000mm(Detachable 3 parts) |
submersible heating system | Diving bell:φ2500×3600mm |
Guide ballast:3200×2500×2000mm | |
Equipment container:6058×2438×2591mm |